Building projects across the UK

Know the cost.
Build with confidence.

Independent cost estimates for homeowners and architects, and quote checks for builders. We measure the drawings the way a quantity surveyor would and compare quotes line by line, so everyone on the project knows exactly what is included.

Who are you?

Homeowners Understand your costs, and choose your builder with confidence. For homeowners → Builders Check your quotes are clear before you send them. For builders → Architects Give clients a realistic budget from your drawings. For architects →

One benchmark for the whole project

  1. 1 Drawings inPlanning or building regs drawings, as PDFs.
  2. 2 Measured and pricedEvery element measured the way quantity surveyors measure, and priced at current rates for the region.
  3. 3 Quotes checked like for likeWhat's included, what's left out, and what's vague — with the likely cost of each gap.
  4. 4 Changes priced and agreedVariations priced as adds less omits, the builder's price checked, and each one approved before work goes ahead.
The back of a red-brick house mid-renovation, with a new steel beam and large sliding doors being fitted
A finished kitchen extension with painted shaker units, a dark island and oak flooring

Built by a quantity surveyor

Measuring work and checking prices is what quantity surveyors do on large projects. Benchmark My Build brings that same independent check to home building projects — tested against professionally priced estimates on real jobs.

We don't build, and we don't take commission from builders. The estimate is an independent benchmark, not a quote.

Variations

When the job changes, see the cost first

Variations are where building budgets slip. Raise a change, see an estimate of what it could cost net of the work it replaces, then check the builder's price before it's approved.

  • Adds less omits: every change is priced as the new work, less the original work it replaces, so you see the true net cost.
  • Checked, not guessed: the builder's price is checked for scope, cost and credit for omitted work.
  • Approved and recorded: agree each change before the work goes ahead, with a running total and revised final account.
  • Fewer surprises: likely unknowns are flagged at quote stage, so a contingency can be agreed up front.

All figures are estimates. Actual costs are set by the builder's priced variation.

Change 3: wider opening to the garden

Illustrative example

Work no longer needed: lintel and brickwork−£1,150
New work: steel beam, padstones, making good+£3,900
Engineer and building control+£1,350
Extra cost of this change+£4,100
Builder's price +£4,350Fair price · approved
Agreed quote
£148,500
Approved changes
+£4,350
Revised total
£152,850

Be first to try it

Join the waiting list for early access. Simple, clear pricing, announced at launch.

Tell us who you are to join the right list: