For architects and designers

Give clients a realistic budget from your drawings.

An independent, element-by-element cost estimate at planning or building regs stage — so the design and the budget agree before the job goes out to builders.

We’ll only use your email to tell you when we launch. Privacy notice

Budget check at building regs

Illustrative example

Client's budget

£150,000

Estimate from drawings

£171,800

Biggest cost drivers

Glazing — sliding doors and roof lantern£24,300
Steelwork to rear wall opening£9,800
Kitchen and finishes£31,500

See where the money goes, and test changes before the design is fixed.

Fewer budget shocks, happier clients

Budget certainty early

Know whether the design fits the client's budget before you've spent weeks on detail.

Test design options

Re-run the estimate when the drawings change, and show clients what each option costs.

Compare tenders like for like

Builders' quotes checked line by line for exclusions, provisional sums and vague items.

A report to share

A clear summary for your client, with the professional detail behind it.

How it works

  1. 1

    Upload your drawings

    Planning or building regs drawings, as PDFs.

  2. 2

    Get a cost estimate

    Measured sheet by sheet like a quantity surveyor — existing against proposed, every figure cross-checked — and priced element by element at current rates for the region. A thorough assessment takes 5–10 minutes.

  3. 3

    Add the tenders

    Each builder's quote checked against the estimate and against each other.

  4. 4

    Advise your client

    Share a clear report and help them choose with confidence.

Variations

Know what a design change costs

Get an early estimate of the cost of design changes, ahead of the builder's pricing.

  • Price a revised opening, layout or spec as adds and omits against the original estimate.
  • Structural changes flag knock-ons: engineer's fees, building control, steel lead times and programme.
  • Keep the client's revised total in view as the design develops.

All figures are estimates. Actual costs are set by the builder's priced variation.

Variation 3: widen rear opening

Illustrative example

Omit: lintel and brickwork−£1,150
Add: steel, padstones, making good+£3,900
Engineer and building control+£1,350
Net (extra-over)+£4,100
Builder's price +£4,350Fair price · approved
Contract sum
£148,500
Approved variations
+£4,350
Revised final account
£152,850

Got a scheme on the board?

Join the waiting list for early access. Pricing is announced at launch.